Chorley All Seasons Leisure Centre

John Turner Construction is pleased to announce the commencement of a major refurbishment and upgrade project at Chorley All Seasons Leisure Centre, delivering significant improvements to both the facility’s fitness offering and its environmental performance.

Appointed as design and build contractor, John Turner Construction will undertake a comprehensive transformation of the existing leisure centre, enhancing the overall user experience while futureproofing the building through a series of energy-efficient interventions.

At the heart of the scheme is a substantial expansion of the existing gym provision. The upgraded facility will create a larger, more flexible fitness environment, with increased floor space and the introduction of a mezzanine level. This enhanced layout will accommodate state-of-the-art equipment, supporting a wide range of weight training and resistance-based activities and providing members with a high-quality, modern fitness experience.

In addition to the gym improvements, both wet and dry side changing facilities will be fully remodelled and refurbished. These works include upgrades to showering areas and toilet facilities, ensuring a more comfortable, accessible and contemporary environment for all visitors.

The project has been further supported by a Salix grant award, enabling the delivery of significant decarbonisation and fabric improvement works to the building. As part of this programme, energy efficiency measures will be prioritised in the early phases of construction. These works will include the installation of solar photovoltaic panels with associated battery storage, over-cladding of the existing roof and enhanced insulation to improve the building’s overall thermal performance, alongside upgrades to the existing mechanical and electrical systems.

These improvements will substantially reduce the building’s environmental impact, lower operational energy demands and contribute to long-term sustainability goals.

This investment represents a major enhancement to Chorley’s leisure infrastructure, supporting healthier lifestyles within the local community while protecting and extending the life of a key public asset.

Our client’s responses

” John Turner has won a number of tenders at Edge Hill University and has been consistently successful in completing high quality projects, on programme and on budget. “

” I would like to express our sincere thanks and appreciation to your entire team who were responsible for delivering such a successful project. We would especially like to recognise the dedication and commitment your team gave the project which was completed with minimal disruption to our hospital functions. ”

” The project has been a real success and this is due to the professional and well organised manner in which John Turner’s staff conducted themselves. There was excellent communication with a priority for safeguarding the pupils and staff at all times. “

” It is extremely refreshing to know that the enthusiasm, professionalism, dedication and humour is still available in the right proportions to make things happen in the construction industry. What is most pleasing is that at all times, the requirements of the Client and Church of England Pensions Boards as the end-user was paramount. Collectively, we have achieved completion on time, a building within budget and in some areas exceeded the client’s expectations. “

” Just a line to express my thanks and appreciation of your sterling efforts to secure the completion of this project within the agreed programme. I am impressed by both the attitude and approach of your organisation. Thanks once again on behalf of my colleagues and the clinical staff with whom you developed a true spirit of co-operation under difficult circumstances. “

1907

Established

21

Years RoSPA Accredited

Over 130

Directly Employed Trade Operatives