Engineering Two Building

Lancaster University

Lancaster University appointed John Turner Construction as the Principal Contractor for the new Engineering Two construction project. Our established relationship with the University, stemming from the successful completion of the Management School West Pavilion and the Library Extension projects, brought valuable experience to this design and build scheme.

Prominently situated adjacent to the existing Engineering building, the new three-storey facility features a brick façade inspired by Lancashire’s local industry and heritage, with purpose-made adjustable lintels fabricated to form several large feature arches. The steel frame building stands on piled foundations on the site of the former sports hall and swimming pool.

Engineering Two, spans 2900 m2 and encompasses three floors of teaching spaces, creating a world-class engineering environment on the university campus. Its ground floor houses a research-rig hall, an electron microscope suite with a dedicated material preparation laboratory and various specialised laboratories for chemical, hydrogen and bioengineering studies. Additionally, it includes a flexible engineering design laboratory and an 80-seat 3D lecture theatre with retractable seating. The building is fully accessible, incorporating hearing loops, adjustable furniture layouts and accessible toilet facilities, all accessible by lift.

The site, bound by a netball court, pathways and adjacent buildings, required meticulous planning. Collaborating closely with the University, John Turner Construction developed robust logistics, access, delivery, noise control, and site management plans to ensure safety and minimise disruption throughout the construction process.

Client: Lancaster University

Our client’s responses

” John Turner has won a number of tenders at Edge Hill University and has been consistently successful in completing high quality projects, on programme and on budget. “

” I would like to express our sincere thanks and appreciation to your entire team who were responsible for delivering such a successful project. We would especially like to recognise the dedication and commitment your team gave the project which was completed with minimal disruption to our hospital functions. ”

” The project has been a real success and this is due to the professional and well organised manner in which John Turner’s staff conducted themselves. There was excellent communication with a priority for safeguarding the pupils and staff at all times. “

” It is extremely refreshing to know that the enthusiasm, professionalism, dedication and humour is still available in the right proportions to make things happen in the construction industry. What is most pleasing is that at all times, the requirements of the Client and Church of England Pensions Boards as the end-user was paramount. Collectively, we have achieved completion on time, a building within budget and in some areas exceeded the client’s expectations. “

” Just a line to express my thanks and appreciation of your sterling efforts to secure the completion of this project within the agreed programme. I am impressed by both the attitude and approach of your organisation. Thanks once again on behalf of my colleagues and the clinical staff with whom you developed a true spirit of co-operation under difficult circumstances. “

1907

Established

18

Years RoSPA Accredited

Over 130

Directly Employed Trade Operatives